EgyptAir crew reacted wrongly to collision-avoidance orders
Belgian investigators have disclosed that the crew of a climbing EgyptAir Airbus A300-600 freighter misunderstood an instruction to level off from its collision-avoidance system before a serious airprox involving an Air France A320. The A300, flying east from Ostend to Cairo on airway UL607, had been cleared to 21,000ft after take-off and was climbing at 2,500ft/min. Belgium's Air Accident Investigation Unit says the A300 was set to pass behind the northbound A320 which was flying on airway UN873 at the higher level of 22,000ft. The controller instructed the A320 to diverge left from the airway, towards a waypoint designated FERDI, to speed its crossing. Although the A300 crew had been advised about the A320, which would cross from right to left above them, and had correctly read back instructions to maintain 21,000ft, the freighter continued to climb. Both aircraft issued collision-avoidance advisories, with the A300 crew ordered to level off, having not shown any "visible change" of vertical speed as the jets approached. Investigators state that the A300 crew later claimed to have "understood a 'climb' instruction". The captain took control from the autopilot and, instead of levelling the aircraft, increased its climb rate to 3,500ft/min. Story has more details. While investigators have yet to reach formal conclusions over the 1 January incident, pan-European air navigation organisation Eurocontrol has simulated the encounter to explore alternative scenarios.<br/>
https://portal.staralliance.com/cms/news/hot-topics/2017-12-28/star/egyptair-crew-reacted-wrongly-to-collision-avoidance-orders
https://portal.staralliance.com/cms/logo.png
EgyptAir crew reacted wrongly to collision-avoidance orders
Belgian investigators have disclosed that the crew of a climbing EgyptAir Airbus A300-600 freighter misunderstood an instruction to level off from its collision-avoidance system before a serious airprox involving an Air France A320. The A300, flying east from Ostend to Cairo on airway UL607, had been cleared to 21,000ft after take-off and was climbing at 2,500ft/min. Belgium's Air Accident Investigation Unit says the A300 was set to pass behind the northbound A320 which was flying on airway UN873 at the higher level of 22,000ft. The controller instructed the A320 to diverge left from the airway, towards a waypoint designated FERDI, to speed its crossing. Although the A300 crew had been advised about the A320, which would cross from right to left above them, and had correctly read back instructions to maintain 21,000ft, the freighter continued to climb. Both aircraft issued collision-avoidance advisories, with the A300 crew ordered to level off, having not shown any "visible change" of vertical speed as the jets approached. Investigators state that the A300 crew later claimed to have "understood a 'climb' instruction". The captain took control from the autopilot and, instead of levelling the aircraft, increased its climb rate to 3,500ft/min. Story has more details. While investigators have yet to reach formal conclusions over the 1 January incident, pan-European air navigation organisation Eurocontrol has simulated the encounter to explore alternative scenarios.<br/>